Application Scope
– Roofs and balconies for waterproof protection
– Interior and exterior cement flooring coatings
– Swimming pools, bathrooms, and shower room linings
– Renovation waterproofing for tiles, marble, and floor slabs
– Anti-corrosion coatings on metal surfaces
Suitable Substrates and Recommended Primers
| Substrate Type | Recommended Primer |
| Cement concrete, mortar leveling layers | ST400 Waterborne Epoxy Penetrating Primer |
| Tiles, marble, floor slabs | ST300 Interface Treatment Primer |
| Metal substrates | Anti-rust primer or special metal primer (consult separately) |
Main Technical Specifications
| Item | Specification | Test Method |
| Color | Waterborne Topcoat Color Card | Visual Inspection |
| Fineness | ≤30 μm | GB/T 6753.1-2007 |
| Solid Content | ≥95% | GB/T 1725-2007 |
| Gloss (60°) | 50–70° | GB/T 9754-2007 |
| Impact Resistance | 50 kg·cm | GB/T 1732-93 |
| Flexibility Test | ≤2 mm | GB/T 6742-2007 |
| Hardness (Shore D) | D70 | GB/T 531.1-2008 |
| Adhesion | Grade 0–1 | GB 1720-79 (89) |
| Alkali Resistance | 48 h, no abnormality | GB/T 9265-2009 |
| Water Resistance | 168 h, no blistering or peeling | GB/T 1733-1993 |
Construction Recommendations (Cement Substrate)
Surface Preparation: Ensure the substrate is dry, flat, free of oil stains, and free of chalking.
Primer Application (ST400): Apply one coat with a roller and allow to dry for 2–4 hours.
Topcoat Mixing: Mix Component A:B at 2:1 by weight, stir thoroughly, and use within 20 minutes.
Application Methods:
– Trowel Application: Approx. 0.35 kg/m²
– Roller Application: Apply in two coats, total approx. 0.5 kg/m²
Curing: After completion, keep the surface ventilated and dry, avoid rain contact, and allow curing for more than 24 hours.
Precautions
– The material is two-component and must be mixed strictly according to the ratio.
– Avoid humid environments and standing water during application to prevent blistering/bubbling.
– In winter, extend curing time by 1–2 days.
– After mixing, apply immediately to avoid thickening and loss of effectiveness.
– As this topcoat is solvent-free, ensure good ventilation at the construction site.
Storage and Transportation
Storage Temperature: 5–35℃, keep away from light, fire, and frost.
Shelf Life: 6 months (unopened).
Transport: Complies with non-hazardous goods transport standards.
Warm Reminder
Please carry out a small-area trial before large-scale application to confirm substrate compatibility and construction feasibility. For construction videos, supporting solutions, or one-on-one technical support, please feel free to contact us.





Reviews
There are no reviews yet.